Frequently asked questions

The site is located outdoors and there is no hazardous chemical warehouse within 20 meters.
As close as possible to the power distribution room, the distance from the power distribution room should not exceed 100 meters.

The installation of energy storage power stations needs to be recorded on the website of the local development and reform bureau, and this procedure is responsible for the integration operator, and the owner only needs to cooperate to provide information.

After the formalities are completed, the formal construction period is about 1-1.5 months; Short-time power interruption is required for the installation of grid-connected cabinets, and the shortest power failure time is about 2 hours.

For customers who choose an integrated operator, the integrated operator will be responsible for the operation and maintenance of the energy storage power station after completion, and will generally provide simple training to the relevant staff of the owner and provide treatment plans in special circumstances.

No. If you charge by capacity, the basic tariff is fixed. If it is on-demand charging, it is also possible to reduce the basic electricity bill because the energy storage discharge bears the load, reducing the maximum demand.